Definitions:
Data Level | Brief Description | Nominal Delivery Schedule | |
---|---|---|---|
Raw | Raw telemetry data as received at the ground receiving station |
| |
L0 | Binary CCSDS packets (as produced by the corresponding instrument; unpacked metadata | Survey: Within 30 minutes of telemetry arriving at the SOC. | |
L1A | Extracted telemetry items; no calibrations or corrections applied; B and Vsc to all investigations | Survey (for SITL support): within 60 minutes of Survey telemetry arriving at the SOC. | |
L1B | Extracted telemetry data to which instrument-level provisional calibrations have been applied; simple moments, spectral indices | Survey (for SITL support): within 60 minutes of Survey telemetry arriving at the SOC. | |
QL | Scientific data products that are generated using simplified science processing algorithms, e.g. with provisional calibrations. | Survey: within 60 minutes of Survey telemetry arriving at the SOC. | |
L2pre | "Instrument“Instrument-level" level” research-grade data product, best calibrations to shorter-term delivery date. Quality is sufficient for designated intra-instrument L2 products to be processed. | Within two weeks of AFG and DFG telemetry arriving at the SOC. Note that this is an internal MMS product and not expected to be released to the general research community. | |
L2 | "Instrument-level" “Instrument-level” research-grade scientific data products, definitive products | Available to the general research community within 35 days of telemetry downlink. To support this timeline, instrument teams deliver L2 files to the SOC within 30 days of L0 data being available at the SOC. | |
L3 |
| 1) Following the point in time when the PI or his designate identifies an event period as one on which the instrument teams should focus, the associated Level-3 data from all sources will be made available to the broader scientific communities at the time determined by the PI or his designate for validates the scientific evaluation value of that eventdata, or within 60 days, whichever period is shorter. |
Note: Survey-based Quicklook and Level-1 products are planned to be used for SITL analysis. FPI is planning to produce a SITL-specific product