Page History
r cCon
Info | ||
---|---|---|
| ||
MMS Workshops10th MMS Community Workshop |
Info | ||
---|---|---|
| ||
Phase 8D Multi-mission Conjunction Opportunity >3 missions conjunctions with MMS, ARASE, THEMIS and/or Cluster, some with foot point in North-American sector Presentation by Nakamura, Y. Miyoshi, N. Kitamura: MMS-ARASE Conjunction observations during Phase 8d,(9a) - slides attached here. |
Info | ||
---|---|---|
| ||
MMS Calibration and Measurement Algorithms Document (CMAD)v2.0 Released 22 November 2022 includes and supersedes previous Instrument User Guides Appendix G - CMAD - MMS_SeniorReview2023_v22Nov2022.pdf Comments/Additions are always welcome. Send those to Ashley King (ashley.k.barrett@nasa.gov), who will forward them to the appropriate team for inclusion. |
Info |
---|
Special IssuesPhysics of Plasmas Closed for submissions, the Special Issue is available online here. A limited number of hard copies will be printed and distributed. More details to come soon. Guest Editors: Julia E. Stawarz (Imperial College London) and Kevin Genestreti (Southwest Research Institute) |
Info | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MMS Science TeleconsTuesdays, 10:00 am | Central US Time | 1 hourJoin the MeetingMay 14, 2024SwRI-HPCA: Hosted by Kristie Llera Sarah Vines:, “Cold and heavy ions at the magnetopause during the 2019 string-of-pearls campaign: A re-visit in preparation for the next string-of-pearls formation” Joon Kim: presenting for Jerry Goldstein, "Convective Propagation and Growth of Fine-Scale Structure in Plasmaspheric Plumes"
Schedule
NOTE for those that visit NASA Goddard – A new Main Gate entrance and badging office on ICESat Road is operational (see map). The new badging office in Building 17 is intended to provide an improved experience for visitors and employees. When hosting, please feel free to think broadly about your approach. For example,
As always, every host prioritizes anyone from across our community that wishes to present their new material for feedback from the team, especially to check the use or interpretations of the datasets. If you are a "late breaking" co-author addition to an about-to-be submitted paper, it is a good practice to ask the author of that paper to present at this forum. |
Info | ||
---|---|---|
| ||
Orbits / Formations / SROIs - Year 8 |
Info |
---|
FY24-FY25 Formation Change |
Info | ||
---|---|---|
| ||
Links to Other Meetings:2023 US-Japan Workshop on Magnetic Reconnection, from Jun. 26 to Jun. 29, 2023, at Daiwa Royal Hotel, Ise Shima, Japan Links to Previous Meetings:
Want to add a meeting to this list? Please feel free to log in and hit that "edit" button. |
Info | ||
---|---|---|
| ||
Administrative
|
...
border | false |
---|
...
width | 70% |
---|
Fall 2015 Science Working Group / Team (SWG/SWT) Meeting
2-6 November 2015, SwRI, San Antonio TX: Logistics: Agenda (TBS), Registration; Updates; Hotels
The Fall SWT meeting will convene on Tues. 3 Nov. 2015, and adjourn on Thurs. 5 Nov. An SWG meeting and instrument team meetings will be scheduled during the same week and notifications will appear in the agenda when it is posted here.
Eclipse Season Science Working Group / Team (SWG/SWT) Face-to-Face Meeting
18-21 May 2015, LASP, CU Boulder: Logistics, Agenda V4a, Registration; Updates; Hotels
The "Eclipse" SWT meeting will convene on Tuesday, May 19 at 8:30 am and adjourn on Thursday, May 21 at 5:00 pm.
Science Working Team Telecon:
Agenda: Telecon 2015-05-12
MMS News (For the latest on MMS commissioning, see Payload Status link at right)
- New: 13 May: SWT Agenda V4a posted at the Meeting link above.
- New: 8 May: All ADP booms and EIS doors have deployed successfully. MMS #3 -Z ADP boom remains at 97% deployed but is fully functional.
- New: 6 May: SPDF Orbit Plots for MMS and other missions linked at the right under "Operations".
- 6 May: SWT Agenda V2 posted at the Meeting link above.
- 4 May: +Z ADP Boom deploy successfully completed on MMS 1, 2, 4; now complete on all four s/c.
- 15 April: SDP 1-4 fully deployed on MMS 1-4.
- 8 April: Published chapters of the MMS Book can be accessed using the "MMS Book" link at the right.
- 8 April: The Commissioning Plan Overview was moved to the Payload Status page, accessible at the right.
- 7 April: SDP 1-4 successfully deployed to 17 m on MMS1-4.
- 1 April: EDI is the first instrument to complete a full HV checkout on all four s/c.
- Early MMS data examples are posted under "Discussions" at the left in the navigation column.
- The Fall 2015 MMS SWT Meeting has been set for 2-6 November at SwRI in San Antonio, TX.
- 23 Mar: LV activations underway on all four s/c.
- 17 Mar: Probe receivers, MAG booms deployed, MMS captures first data including a substorm.
- 13 Mar: SWT presentations have been posted under "Discussions" on the navigation column to the left.
- 13 Mar: MMS had a picture perfect launch, injection, and separation of the four spacecraft! GO MMS!
=====================================================================
- 7 Mar: A further revision of the SWT meeting agenda was posted. Changes are mainly on Wednesday, 11 Mar.
- 27 Feb: A major revision of the SWT meeting agenda has been necessary owing to the need for time for launch pad tours. See link above.
- 25 Feb: Encapsulation was completed and the payload is on the transporter for delivery to the launch vehicle.
- A set of photos have been posted of the MMS stack and shroud being prepped for encapsulation.
- 18 Feb: SWT Agenda has been corrected/updated with minor changes, including the abbreviated version above.
- 17 Feb: Final stacking of the spacecraft has been completed. Next: pyro mating, bagging, move to encapsulation. LV testing underway.
- 17 Feb: NASA Guest Operations is expected to mail invitations to the launch by 17 Feb. Additional information will be provided with the invites.
- Scientist In The Loop added to this page at upper right.
- 20 Jan 2015: Future Plans: The first post-launch MMS SWT meeting will be in Boulder at LASP on 18-21 May, during the "eclipse break" from commissioning of the spacecraft.
- MMS Book Chapters can be browsed with the following linked search: http://link.springer.com/search?query=Magnetospheric+Multiscale
- 15 Jan 2015: Future Plans Made: The first post-launch MMS SWT meeting will be in Boulder at LASP on
15-19 June18-21 May, during the "eclipse break" from commissioning of the spacecraft. - If for any reason the launch slips, it will do so one day at a time, and it is expected that the launch will occur not later than 16 March.
- 12 Jan 2015: ULA reported to LSP and MMS that the qualification test of the new Booster Main Vehicle Battery (BMVB) was completed. Initial indications are the battery passed the test with the expected post-test VOC and a successful functional test after vibration. The battery capacity test and a DPA of the cells will be completed this week. This further increases confidence that the battery issue will be resolved in time to maintain the 3/12/2015 launch date.
- 11 Jan 2015: The orbital debris waiver for the Centaur upper stage has been approved by NASA HQ.
- Oct 2014: Magnetic explosion probes make it to the Cape
- 20-21 Oct 2014 GSFC SWT Meeting presentations are posted.
- 29 Oct 2014: MMS Spacecraft #1 and 2 shipped to KSC on 28 Oct. 2014 and have now arrived.
- 22-24 Oct 2014: The MMS Pre-Ship Review was held.
- 17 Oct 2014: The MMS Media Day and Social was held.
- The MMS Launch Readiness Date has been confirmed at 12 March 2015.
- 25-27 Mar 2014 U-Iowa SWT Meeting presentations are posted. Photo of Kletzing add to photo gallery page.
- The MMS-THEMIS Coordination Working Group Page contains important information.
- MMS Book chapter manuscripts are now due to be submitted both here for internal review, and at the Space Science Reviews site, as explained here
- For the latest on MMS, like us on Facebook
- 20 Nov 2013: A current list of MMS publications has been created.
- 26-28 June 2013 Mission Operations Review GSFC
- 10 June 2013: First CPT completed successfully! Congrats to I&T Team!
- Science article on President's Budget and impacts on STEM Education and Outreach.
- 27-30 Aug 2012: Mission SIR at GSFC
- 11 Jan 2012: IS SIR at SwRI and on WEBEX for instrument team leads. [Presentations are here.|http://tinyurl.com/773njst
- 10 June 2011: Commissioning discussion at GSFC
- 7-9 June 2011: Ground System PDR at GSFC
- 1-2 June 2011: SRB Update Briefing at GSFC Visitor Center
- 18 May 2011: "Interactive Tools for Data Transformation and Visualization" by J. Heer @ GSFC IS&T Colloquium
- 5-6 May 2011: SOC Technical Interchange Meeting at LASP
- 4 May 2011: Pre-PDR Peer Review of SOC at LASP
- New MMS Project Web Site is up. Check it out and comment here...
...
width | 30% |
---|
Gallery | ||||||||
---|---|---|---|---|---|---|---|---|
|
...
icon | false |
---|
...
Science Data:
Science Data Center (beta)
Data Rights and Rules for Use
Data Product Levels
Data Products List
...
|
...
Administrative: |
---|
Meetings Archive: |
---|
SWT meeting presentations in "Discussions" |
|
Info | ||
---|---|---|
| ||
Operations and Software |
Gallery | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
|
...
Overview
Content Tools
Activity
Tasks