CIRBE’s XB1 was successfully delivered and bench-tested on September 1st, 2021. The BCT delivery team (SE, ME, and Test Engineer) and the CIRBE LASP team worked together to accomplish the following tasks:
- Instruction on handling and integrating the XB1
- Instruction on deployments and how to stow the solar arrays and UHF antenna
- Performed mechanical deployments
- Connected electrical GSE
- Post ship turn on using COSMOS (BCT)
- Connected HYDRA and tested the bus using OASIS-CC (LASP)
All systems tested above appear to be working nominally. The next step is to perform a bus CPT and proceed with safe to mates and flight integration of the XB1 and REPTile-2.