Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

4/5 tagup (Kris, Steve, Mike, Li-Jen) summary: Kris to check on the VM status in person right after the tagup, expecting the MEC account to be ready this week; Steve confirmed that the LANL code is ready to run on RH. 

4/19 tagup (Adrian, Li-Jen) summary: VM is set up and MEC account is ready at SDC; Adrian will provide Steve the login information right after tagup.


MEC -> SDC Transition Timeline  (DRAFT by Kris Larsen)

...